Projects

Our engineering team always works with Client and Principal contractors in partnering approach by connecting their mindset to assure the work process can be operated smoothly and meet their ultimate needs and goals.

Below are some of our projects

Residential Development “ORI” at TMTL508, Junction of Tsun Wen Road and Leung Tak Street Area 2, Tuen Mun– MVAC Installation

Residential Development “ORI” at TMTL508, Junction of Tsun Wen Road and Leung Tak Street Area 2, Tuen Mun– MVAC Installation

The residential development at Tuen Mun TMTL 508 consists of 2 nos. residential blocks resting on a podium. The podium consists of carparks, retail shops and a clubhouse.

Air-cooled chiller plant with cooling capacity of 2 x 144TR is provided to serve 1/F Retail Shops. To comply with the stringent acoustic requirement, large exhaust air duct, duct silencer, structural steel framework, acoustic intake air louvres and acoustic enclosure are adopted.

ASD - Conversion of Former French Mission Building to Law Related Organization - HVAC Installation

ASD - Conversion of Former French Mission Building to Law Related Organization - HVAC Installation

Page 148 Hotel at Austin Road – MVAC Installation

Page 148 Hotel at Austin Road – MVAC Installation

Hotel Building with water-cooled chiller plant capacity of 600 tons. High COP Oil free chillers are adopted

Nan Fung Tower – Chiller Replacement & System Optimization

Nan Fung Tower – Chiller Replacement & System Optimization

Hotel Development at Des Voeux Toad West – MVAC Installation

Hotel Development at Des Voeux Toad West – MVAC Installation

La Cresta – Nan Fung Development at Kau To Shan Lot No. 563 – MVAC Installation

La Cresta – Nan Fung Development at Kau To Shan Lot No. 563 – MVAC Installation

Le Vetta – Wing Tai Properties at Kau To Shan Lot No. 567 – MVAC Installation

Le Vetta – Wing Tai Properties at Kau To Shan Lot No. 567 – MVAC Installation

Goodman Interlink Godown in Tsing Yi – MVAC Installation

Goodman Interlink Godown in Tsing Yi – MVAC Installation

A 23-storey building with MVAC system consists of centralized chilled water system serving the office area, dynamic smoke extraction system serving carpark & driveway and staircase pressurization system.

S.F. Express Logistics Centre in Tsing Yi– MVAC Installation

S.F. Express Logistics Centre in Tsing Yi– MVAC Installation

Building (basement to 14/F) with office floor of 19,500m2 and 77,500m2 warehouse area. MVAC Installation with chiller plant capacity of 3,517kW to serve office area, condensing water system of heat rejection of 6,040kW for warehouse were provided.

Chiller Plant

  • 100% Radiographic testing (Gamma Ray) for all butt welded joint of pipe diameter 300mm and above.
  • 5% Radiographic testing for butt weld joint of diameter below 300mm.

International Christian Quality Music School in Diamond Hill– MVAC Installation

International Christian Quality Music School in Diamond Hill– MVAC Installation

This is a primary and secondary school providing both academic and musical education and consists of assembly hall, multi-function room and music practice room. MVAC installation of stringent acoustic requirement on the above function room is achieved. Assembly Hall achieved noise level NC 20.

Phoenix Satellite TV - Headquarter at Tai Po– MVAC Installation

Phoenix Satellite TV - Headquarter at Tai Po– MVAC Installation

A 4-storey building included Main Studio, 6 nos. of Studio, server room and office area. MVAC system consists of Centralized Chilled Water System, Air handling distribution system and CRAC unit. High quality acoustic treatment work is required for Studio area where served for TV programme production.

Have a Question?


Contact Us